MDP provided full MEP design for a new, 4-story, 426,377 GSF mixed-use project in Westminster, CO. The project is part of the 105-acre redevelopment of the former Westminster Mall. The project includes 287 for-rent apartment units, retail space, a 124,263 SF precast concrete parking garage, and amenity areas. The building structure is wood construction over a concrete podium.

Project Highlights:

  • The project was designed to achieve LEED Silver certification. Low-flow plumbing fixtures were chosen as well as an Aquatherm mechanical system which uses the domestic hot water from the water heaters to heat the units.
  • The lighting design for the building is all high efficiency LEDs with controls that utilize daylight harvesting and comply with ASHRAE 90.1 2013.

MDP Engineering Group has achieved remarkable milestones

Our commitment to excellence and innovation has earned us numerous industry awards and a reputation for delivering top-notch engineering solutions. Join us as we continue to build a legacy of success and reliability in the engineering industry.

10
Licensed Professional Engineers (P.E.)
40+
Local Team Members
20+
State Licenses
100+
LEED Certified Projects
York Street Residences

York Street Residences

Mechanical
Electrical
Plumbing
Westminster Row

Westminster Row

Mechanical
Electrical
Plumbing
LEED Design
The Fitzgerald

The Fitzgerald

Electrical
Mechanical
Plumbing
8th & Sherman Residences

8th & Sherman Residences

Mechanical
Electrical
Plumbing