MDP provided design solutions to not only develop an efficient MEP system, but also to create a quiet and comfortable environment for students and educators. The project was a10,000 SF renovation of the existing 5280 Charter School. MDP’s scope included replacing three rooftop units with more efficient models; providing carbon dioxide sensors and controls interface for demand control ventilation; replacing noisy gas unit heaters with hot water heating coils connected to the existing boiler system; adding new low flow plumbing fixtures; and adding all new efficient LED light fixtures/luminaries with daylight and occupancy sensors to save energy.

MDP Engineering Group has achieved remarkable milestones

Our commitment to excellence and innovation has earned us numerous industry awards and a reputation for delivering top-notch engineering solutions. Join us as we continue to build a legacy of success and reliability in the engineering industry.

10
Licensed Professional Engineers (P.E.)
40+
Local Team Members
20+
State Licenses
100+
LEED Certified Projects
Intercontinental Hotel & Condos

Intercontinental Hotel & Condos

Life Safety
Smoke Control
Lucky Strike Bellevue

Lucky Strike Bellevue

Mechanical
Electrical
Plumbing
Marriott AC Hotel Seattle

Marriott AC Hotel Seattle

Mechanical
Electrical
Plumbing
Lucky Strike Hawaii

Lucky Strike Hawaii

Mechanical
Electrical
Plumbing