MDP provided MEP design services for the renovation of the Ralph L. Carr Colorado Justice Center. The project was a tenant improvement project and consisted of the following:
-SIPA relocation from 11th Floor to the 4th Floor: 3,631 sq. ft.
-Ombudsman Tenant Improvements on the 4th Floor: 2,361 sq. ft.
-SCAO 11th Floor: 3,602 sq. ft.
-Alternate Defense Council Tenant Improvements on the 3rd Floor: 2,413 sq. ft.
-Financial Services 12th Floor: 1,706 sq. ft.
Total square footage equaled 13,713. Mechanical Design mainly consisted of relocating existing air terminals and diffusers; and the addition of new air terminal units and diffusers, as was required per the new layout. The Electrical Design included power and lighting circuiting design.
MDP Engineering Group has achieved remarkable milestones
Our commitment to excellence and innovation has earned us numerous industry awards and a reputation for delivering top-notch engineering solutions. Join us as we continue to build a legacy of success and reliability in the engineering industry.